  • BRYANT STREET LOFTS

  • Location: San Francisco, CA
  • Quantities: 16,200 sf of stucco
  • Job Duration: 20 Working Days
  • Volume Generated: 118 tons of stucco debris removed for a 99.8% diversion rate

Scope

  • Waterproofing repair job required SV to remove all stucco from exterior walls and elevated interior corridors of this 4 story residential loft complex.
  • Approximately 16,200 sf of stucco was removed in just under a month.
  • Zero damage to sheathing beneath stucco.
  • Traffic control and proper chute placement was extremely important as this was in a highly dense metropolitan area with a large traffic count.
  • Strategically placed netting down the sides of the scaffolding to keep the stucco debris contained to the immediate area of the demolition.
BRYANT STREET PROJECT_2
BRYANT STREET PROJECT_3
BRYANT STREET PROJECT_4
BRYANT STREET PROJECT_5
BRYANT STREET PROJECT
BRYANT STREET PROJECT_2
BRYANT STREET PROJECT_3
BRYANT STREET PROJECT_4
BRYANT STREET PROJECT_5
BRYANT STREET PROJECT