PROJECTS

No matter what, we always get the job done

  • PARK BROADWAY

  • Location: Millbrae, CA
  • Quantities: 14,800 sf of stucco
  • Job Duration: 25 working days
  • Volume Generated: 102 tons removed for a 99.7% diversion rate

Scope

  • Waterproofing repair job required SV to remove selective stucco from exterior walls and interior corridors.
  • Zero damage to sheathing beneath stucco.
  • Traffic control and proper chute placement was extremely important as this was in a highly dense metropolitan area with a large traffic count.
  • Strategically placed netting down the sides of the scaffolding to keep the stucco debris contained to the immediate area of the demolition.
PARK BROADWAY MILLBRAE DEMOLITION PROJECT
PARK BROADWAY MILLBRAE DEMOLITION PROJECT
PARK BROADWAY MILLBRAE DEMOLITION PROJECT
PARK BROADWAY MILLBRAE DEMOLITION PROJECT